VITREVIA — A Rail-Rated Display Is Not a Qualified Window Assembly Revision: 2026-09-11 Project: ____________________ Configuration / firmware: ____________________ Operator / date: ____________________ Agreed acceptance criteria: ____________________ TEST RECORD (repeat for each check) Requirement ID: Preconditions: Test file / revision: Action: Expected result: Observed result: Evidence location: Pass / Fail / Not tested: Deviation and owner: Retest / closure: Guide: https://www.vitreviadisplays.com/insights/what-must-be-defined-before-quoting-a-rail-window-display/ REFERENCE TABLES Boundary | Question before quoting | Evidence required Vehicle power → electronics | Which input conditions, interruptions and protection requirements apply? | Vehicle interface specification and applicable test configuration Electronics → vehicle network | What information, timing and recovery behaviour are required? | Protocol definition and interface test plan Display → glass/mounting | Which assembly carries loads and controls tolerances? | Controlled glazing/mounting drawings and qualification responsibility Assembly → environment | Which thermal, moisture, EMC and mechanical conditions apply? | Applicable requirements, test levels and representative sample definition System → maintenance | Can the unit be removed and restored without an undocumented process? | Access study, replacement procedure and configuration record