VITREVIA DISPLAY MEASUREMENT / ACCEPTANCE RECORD Blank project worksheet — complete one record per requirement. Project / location: Requirement ID / revision: System model / serial numbers: Assembly boundary (panel / cabinet / complete installed system): Hardware revisions / firmware: Configuration export / checksum: Operating preset / brightness / colour settings: Input resolution / frame rate / encoding / range / bit depth: Test content filename / revision / checksum: Method document / edition / section: Deviations from method and their effect: Ambient lighting / sensor orientation / temperature: Warm-up time / stability criterion / measurement timing: Instrument / serial / calibration date / uncertainty: Instrument distance / angle / aperture: Measurement-point map: Acceptance limit and units: Decision rule / uncertainty / guard band: Raw readings and units: Repeat readings: Calculated result / formula: Pass / fail / review: Evidence filenames: Factory or site test: Performed by (project role) / date: Witnessed by (project role): Corrective action / owner / due date: Retest scope / result: Accepted deviations: Handover configuration and supporting records: